Finishing up the exterior cosmetics, tonight, starting with this steel frame entrance.

Next, a proof-of-concept for the exterior of each maintenance floor. This is roughly what I had in mind from the beginning: the walls of each maintenance floor being recessed inwards by 4m, to make walkable balconies. I made sure when laying out all the machines to leave that space empty.

With walls up, I can’t really put off interior lighting any longer, at least on the maintenance floors, where there’s no windows.

A little bit of tidying and lighting on the roof.

That should do it for the exterior. A little bit more interior work, and we can call this done.